Quality Assurance Plan

RAW MATERIAL | BOUGHT OUT ITEMS | IN PROCESS INSPECTION | FINAL INSPECTION

Sr.No
Component/
Operation
Characteristic
Checked
Category
Type/Methode
of Check
Extent
of Check
Acceptance
of Norm
Agency
P
W
V
 1.00 RAW MATERIAL
1.10
Structural Materials for Grinders, End Carriages, Crab and Platform 1 Sample per size of plate and other structurals
RM
Chemical & Mechanical
MA
IS : 2062
4
3
2
1.20
Rope Drum Seamless Steel Tubes 100%
RM
Acid Etching end
MA
IS : 3177
4
3
2
1.30
Brake Drum 1 Sample
Rm
Chemical Check
MA

IS : 1875
IS : 1030

4
3
2
1.40
Gears & Pinions 1 per size per Lot
RM
Chemical Check
MA

IS : 1570
IS : 970

4
3
2
1.50
Sheave / Pulleys 1 Lot
RM
Chemical Check
MA
IS : 2062
4
3
2
1.60
Wheels 1 Sample
RM
Chemical Check
MA
IS : 1570
4
3
2
 2.00 BOUGHT OUT ITEMS
2.10
Hooks 100%
BOC
U.T.
MA
IS : 3815
4
3
2
2.30
Wire Rope 100%
BOC
Examination of Reports for Braking Load
MA
IS : 2266
3
2
2
2.30
Rails / Sq.Bar 100%
BOC
Visual
MA
BS : 80A
3
2
2
2.40
Bearings 100%
BOC
Visual
MA
Mfgrs. Standard
3
2
2
2.50
Couplings 100%
BOC
Visual
MA
3
2
2
 3.00 IN PROCESS INSPECTION
3.10
Welding of Rope Drum 100%
Welding
RT of Joint
MA
IS : 4853
4
3
2
3.20
Welding of Box Grinders, Crab, End Carrige, L.T. Frames 100%
Random
Welding
Visual MPI / DPT
MA
IS : 822
IS : 3658
3
2
2
3.30
Welding
(Sounding)
100%
Welding
R.T. Butt welds in Tension
MA
IS : 4853
4
3
2
3.40
Gears & Pinions
a) U.T.
100%
U.T. Check
MA
IS : 3664
4
3
2
b) Hardness 100%
Hardness
MA
55-60 HRC
3
2
2
c) Dimensional
Accuracy
Random
Measurement
MA
IS : 4059
3
2
2
d) MPI Random
Crack Detection
MA
IS : 3658
3
2
2
e) Surface Finish Random
Surface Check
MA
1.6 microns max.
3
2
2
3.50
Gear Boxes
a) Sound Level
100%
Sound Check
MA
To be verified by Consultant
3
2
2
b) Leakage 100%
Check by Consultant
MA
To be verified by Client
2
2
1
3.60
Hooks 100%
Proof Load
MA
IS : 3815
4
3
2
 4.00 FINAL INSPECTION
4.10
Motors 100%
EC
Review of Routine TCs
CR
IS : 325
3
2
1
4.20
Cables 100%
EC
Review of Type Test / Routine Test
MA
IS : 694
IS : 554
IS : 9968
3
2
1
4.30
Control Panel, Wiring, Marking Input, Output sequence. 100%
EC
Visual check of fitting of components
CR
Electrical Drawing
IS : 3177
3
2
1
4.40
Components 100%
MC
Visual / rating
MA
Electrical Drawings
IS : 3177
3
2 1
4.50
Complete Assembled Cranes 100%
Crane
Visual & Checking of overall dimensions alignment & Completeness
CR
Final Tech. Spec / Approved Drawings
IS : 3177
3
2 1
100%
Load Test / Overload Test, Deflection Test, Speed & Current Measurements
CR
IS : 3177
IS : 807
Approved Drawings
3
2 1
4.60
Painting 100%
Surface preparation
MI
Client's Specs.
3
2 1
4.70
Lubrication 100%
Client'sSpecs.
3
2 1
  Abbreviation

 P :   Performed By
 W :  Witnessed By
 V :  Verified By